The time sum of the first two growth fractals equals the time sum of the the third and fourth caricatured fractals, distorted by the malinvestment incentives of the operating financialized asset debt system with a nonlinear crash devaluation in the terminal portion of the series as the buying speculator pool is exhausted.
54 weeks = the current 49 weeks plus 5 weeks. The crash sequence: y/2-2.5y/1.6-2.5y: 10/20 of 25/16-25 days